Take this quiz after viewing the “Over Processing” training video.
There are 4 questions in this quiz.
Quiz Summary
0 of 4 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 4 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 4
1. Question
What are the two definitions for the waste of over processing?
CorrectIncorrect -
Question 2 of 4
2. Question
If there is not a clear standard for how to do the job, someone might regularly “overdo it” and do more than what is required. This is over processing.
CorrectIncorrect -
Question 3 of 4
3. Question
Sometimes the waste of over processing occurs simply because defects are accepted as normal and therefore tolerated.
CorrectIncorrect -
Question 4 of 4
4. Question
A well-intentioned operator individually packages parts as they are produced at their station. The parts are then moved to another department where the work is continued. The first thing the next operator does is remove the packaging because it interferes with the work they need to perform. Is this over processing?
CorrectIncorrect